Projects
Our structural refurbishment, strengthening skills and engineering excellence has been used by companies in a wide range of sectors all over the UK. We carry out numerous projects every year, working across our fields of expertise and fulfilling the needs of our clients.
Project Filters
Filtered by
Our Services
Locations
Sectors
Feature
Northumberland Steel Footbridge, Bebside
The Northumberland Line initiative is a collaborative effort between Northumberland County Council,...
Cold Hesledon Footbridge (A19), County Durham
Supporting crucial upgrade works on the A19 in County Durham, Taziker on behalf of BAM Nuttall...
Clifton Suspension Bridge, Bristol
Clifton Suspension Bridge is a Grade I listed structure located in Bristol. The bridge, which...
Manvers Way Footbridge is a cable-stayed steel bridge carrying a footpath across A633 Manvers Way,...
Located in the village of Pendeen, Cornwall, Geevor Tin Mine is the largest preserved mine site in...
Working on behalf of our client The River Dee Trust, Taziker was contracted to permanently...
Wilmslow Railway Station, Cheshire
Taziker was contracted by Network Rail to complete refurbishment works at Wilmslow Station in...
Bell Street Underbridge, Glasgow
Taziker was engaged as Principal Contractor by Network Rail to strengthen and fully refurbish the...
Taziker was contracted by Great Western Railway (GWR) to conduct vital repairs to the water tower...
Victoria Bridge, Mar Lodge Estate
Taziker was contracted by the National Trust for Scotland to undertake major maintenance and...
Tickford Bridge, Newport Pagnell
Constructed in 1810, Tickford Bridge was erected at the height of the Industrial Revolution...
Great Malvern Railway Station, Worcestershire
Taziker was contracted by our client Murphy to undertake preparation, painting and steelwork...
As part of plans to improve transportation and road links on Tanners Bank Bridge, Taziker...
Lady Anne Footbridge, West Yorkshire
Taziker as supply chain partner on the Transpennine Route Upgrade (TRU) project was contracted on...
HS2 Colne Valley Viaduct, Buckinghamshire
To support the construction of the HS2 Colne Valley Viaduct in Buckinghamshire by Align JV,...
Creagan New Bridge, Loch Creran
Taziker was contracted by BEAR Scotland to undertake the major maintenance and refurbishment...
Dantzic Street Bridge Reconstruction, Manchester
The Transpennine Route Upgrade (TRU) is a major, multi-billion-pound programme of railway...
Rochdale Borough Council required the design, build and installation of a new footbridge over the...
Purfleet Embankment, Purfleet-on-Thames
A town in Essex, Purfleet is located in Network Rail’s Anglia route - part of the Eastern...
Muntons Embankment, Stowmarket
This was a highly complex project with a large scope including landscaping and arboriculture,...
Bromborough Station Footbridge, Wirral
Taziker was contracted by Network Rail to provide a full refurbishment of the footbridge at...
Furness Vale Station Footbridge, Derbyshire
The Victorian Furness Vale Station lies on the Manchester to Buxton line, serving the village of...
Taziker was contracted to complete a major conservation project on Iron Bridge in Shropshire,...
Liverpool Street Station Restroom Refurbishment
Taziker was awarded the restroom refurbishment at Liverpool Street Station in London as part of...
Taziker was contracted by Network Rail Capital Projects to carry out refurbishment and...
The Big One at Blackpool Pleasure Beach
Taziker were approached by Blackpool Pleasure Beach in June 2019 with the opportunity to undertake...
The bridge spans 2.75 miles across the Firth of Tay in Scotland and carries the mainline railway...
As the main station serving the famous seaside resort, Blackpool North has regular services to...
The work was delivered on behalf of Network Rail, as part of the Great North Rail Project, to...
Refurbishment of 4 railway underbridges, including the Grade II listed ECM1/184 bridge, the oldest...
The Royal Albert Bridge is grade 1 listed, deemed to be of exceptional architectural and historic...
The bridge carries the West Highland Line across the Caledonian Canal at Banavie. The line opened...
Taziker recently undertook the refurbishment of the Grade II Chester Moor Viaduct. The eight...
Taziker has delivered various works under this scheme, this case study focuses on the removal of...
The existing parapet wall had begun to bulge away and was in need of urgent repair. The arch ring...
This crane is used for loading and unloading ships carrying large undersea cables and required some...
The bridge carried the London and South Western Railway branch to Turnchapel over the River Plym in...
The Tees Transporter Bridge connects Middlesbrough to Port Clarence; using a travelling gondola,...
The bridge carries two ballasted tracks and also has a pedestrian walkway running alongside it....
This five-span viaduct was built in 1860 and each span consists of two wrought iron box...
This five-span viaduct which crosses both a road and a river did not meet the Network Rail...
At more than 110 years old and 400m long, the structure spans an expanse of reclaimed land locally...
Carrying the two tracks of the Liverpool Branch of the West Coast Mainline 23m above the high water...
Carrying the A1231, this four span structure is over 105 years old. Taziker was tasked with...
Refurbishing a historical footbridge Bodmin was the most important town in Cornwall when the...
Taziker Industrial Services is currently providing bespoke access solutions to CNIM for the...
No Project Results. Please adjust your filters.