Where Next?
Carrying the two tracks of the Liverpool Branch of the West Coast Mainline 23m above the high water mark; the bridge consists of three wrought iron...
Bromborough Station Footbridge, Wirral
Taziker was contracted by Network Rail to provide a full refurbishment of the footbridge at Bromborough Station, which is positioned on the Chester...